A line array flown above the stage at First Avenue

Selected work

Rooms we have rigged, wired and commissioned.

Some of these were a single show. Some arrived as somebody else’s drawing and had to end up in the air, on structure, working. All of them had to sound right when the doors opened.

Theaters and music venues, bars and restaurants, houses of worship, school gyms and auditoriums — the rooms fail in different ways, and we write about each of them separately.

Hutton Arena, Hamline University

Design, install & commissioning

Hutton Arena, Hamline University

Animales BBQ Co.

Full AV design-build

Animales BBQ Co.

Normandale Lutheran

Rigging, wiring & commissioning

Normandale Lutheran

Icehouse

Rigging, wiring & commissioning

Icehouse

Riviera Theatre, Chicago

Supply, rigging & commissioning

Riviera Theatre, Chicago

First Avenue — Main Room

Line array rigging

First Avenue — Main Room

Berlin

Venue audio & lighting

Berlin

Uptown Theater

Venue system

Uptown Theater

Green Room

Coverage modeling & system design

Green Room

Mystic Lake Hop House

PA hang, wiring & commissioning

Mystic Lake Hop House

Palace Theatre

Live production

Palace Theatre

How the work arrives

Two ways we come into a job.

Both are the same discipline pointed at different halves of the problem.

A predicted sound pressure level coverage map produced for the Green Room

We design it

Green Room, Animales BBQ Co. and Hutton Arena started with us: room modeling, coverage prediction, drawings, and a specified system with numbers behind it. The Animales lighting plot further down is what that documentation looks like.

A line array being flown above the stage at First Avenue

Or someone else designs it, and we make it real

Icehouse, Normandale Lutheran, Mystic Lake and Parkway arrived as somebody else’s drawing — L-Acoustics’, a consultant’s, an integrator’s. Rigging back to real structure, wiring and commissioning is its own trade, and it decides whether a good design survives contact with the room.

Two L-Acoustics A10i arrays with SB18i subwoofers flown above the bleachers at Hutton Arena

Case study · Hutton Arena

A college gym, ours from the model to the handover.

Hamline University’s basketball and volleyball arena in Saint Paul, until now served by four wall-mounted speakers at court level and a roof horn system that had been dead for years. We modelled the room, designed an L-Acoustics system that aims at the bleachers rather than the hardwood, then installed, tuned and commissioned it. The install took about 80 hours.

Read the case study

An L-Acoustics line array flown above the stage at Icehouse

Case study · Icehouse

An L-Acoustics rig, hung on steel we put there.

A Minneapolis venue whose underpowered PA was limiting what it could book. We supplied new structural steel, then rigged, wired and commissioned an L-Acoustics rig designed and sold through Allied Productions & Sales — sixty-one crew hours in total. Icehouse started booking national touring acts.

Read the case study

L-Acoustics arrays being installed in the sanctuary at Normandale Lutheran, with a lift still in the room

Case study · Normandale Lutheran

Speech intelligibility in a room built to fight it.

A hard-surfaced sanctuary running a single loudspeaker from one side. We rigged, wired and commissioned two L-Acoustics A10i arrays specified through Allied Productions & Sales — about 10.5 crew hours of pre-wire and seventeen of install. Speech intelligibility now holds up during services.

Read the case study

Lighting grid detail for Animales BBQ Co. showing a rigging plan, overhead lighting detail, grid section and front elevation

Case study · Animales BBQ Co.

The other kind of job: ours end to end.

A ground-up audio, lighting and video build for a restaurant and live-music room in North Minneapolis, taken from concept through drawings, rigging, install and commissioning — ours from the first sketch.

Read the case study

Tell us about the room.

Send over the venue, the date and roughly what you need. We read every request and reply with real questions, not a form letter.