A line array flown above the stage at First Avenue

Selected work

Rooms we have rigged, wired and commissioned.

Some of these were a single show. Some arrived as somebody else’s drawing and had to end up in the air, on structure, working. All of them had to sound right when the doors opened.

Riviera Theatre, Chicago

Supply, rigging & commissioning

Riviera Theatre, Chicago

First Avenue — Main Room

Line array rigging

First Avenue — Main Room

Animales BBQ Co.

Full AV design-build

Animales BBQ Co.

Berlin

Venue audio & lighting

Berlin

Uptown Theater

Venue system

Uptown Theater

Normandale Lutheran

Rigging, wiring & commissioning

Normandale Lutheran

Ice House

Rigging, wiring & commissioning

Ice House

Green Room

Coverage modeling & system design

Green Room

Mystic Lake Hop House

PA hang, wiring & commissioning

Mystic Lake Hop House

Palace Theatre

Live production

Palace Theatre

First Avenue — Show night

Show production

First Avenue — Show night

How the work arrives

Two ways we come into a job.

Both are the same discipline pointed at different halves of the problem.

A predicted sound pressure level coverage map produced for the Green Room

We design it

Green Room and Animales BBQ Co. started with us: room modeling, coverage prediction, drawings, and a specified system with numbers behind it. The Animales lighting plot further down is what that documentation looks like.

A line array being flown above the stage at First Avenue

Or someone else designs it, and we make it real

Icehouse, Normandale Lutheran, Mystic Lake and Parkway arrived as somebody else’s drawing — L-Acoustics’, a consultant’s, an integrator’s. Rigging back to real structure, wiring and commissioning is its own trade, and it decides whether a good design survives contact with the room.

An L-Acoustics line array flown above the stage at Icehouse

Case study · Icehouse

An L-Acoustics rig, hung on steel we put there.

The room. A Minneapolis music venue and restaurant running a point-source EV system that was dated and underpowered for what the room was being asked to do.

The design. L-Acoustics, as part of a box sale through Allied Productions & Sales. We came in for rigging, wiring and commissioning — the part where a drawing becomes a system that works.

The problem before the audio problem. There was nothing to hang it from. The job started with a new steel I-beam, supplied and installed, before a single loudspeaker went up.

The system. L-Acoustics A10i arrays with X12 outfills, flown KS21 subs and SB18 subwoofers. The old system came out, the new one went in, and a distributed audio system with its own volume control went through the rest of the venue space.

The work. Sixty-one crew hours: structural steel, rigging, wiring, distributed speakers and commissioning.

What changed. Icehouse started booking national touring acts.

L-Acoustics arrays being installed in the sanctuary at Normandale Lutheran, with a lift still in the room

Case study · Normandale Lutheran

Speech intelligibility in a room built to fight it.

The room. A sanctuary with the acoustics sanctuaries usually have: hard surfaces, a long tail, and a congregation that needs to understand words rather than just hear them. It was running a single Danley enclosure on one side of the space.

The design. Specified and supplied through Allied Productions & Sales. Our scope was rigging, wiring and commissioning.

The system. Two L-Acoustics A10i arrays with X8 outfills — proper left and right coverage in a room that previously had sound arriving from one side.

The work. A pre-wire visit first: around ten crew hours on a lift, pulling 2,500 feet of West Penn 12-2 speaker cable and 2,000 feet of West Penn 291 for signal and control before the room got in its own way. Rigging on Unistrut and half-inch threaded rod, carried back to structure. Then seventeen crew hours of installation plus overtime, because a sanctuary has to be handed back for services. A full demonstration day and a half day of tuning to close it out.

What changed. High speech intelligibility during services, in a very acoustically challenging space.

Lighting grid detail for Animales BBQ Co. showing a rigging plan, overhead lighting detail, grid section and front elevation

Case study · Animales BBQ Co.

The other kind of job: ours end to end.

A ground-up audio, lighting and video package for a restaurant and live music room in North Minneapolis, taken from concept through drawings, rigging, install and commissioning.

The lighting plot alongside is the documentation we produce when the design is ours: fixture positions, trim heights, channel and circuit assignments, rigging points and a front elevation — everything the crew and the venue need to build it and to maintain it afterwards.

Tell us about the room.

Send over the venue, the date and roughly what you need. We read every request and reply with real questions, not a form letter.